Fiberglass Pipelining - Better Than Felt For Sewer Pipe Rehabilitation

Ultraviolet fiberglass cured in place pipe (CIPP) liner is far superior in many ways to felt pipe lining.

One of the main reasons to use fiberglass liner with UV curing, instead of water or steam cured felt liners, is that felt curing causes by-products that negatively affect the environment. In particular cities using felt liners are concerned about flushing styrene-laced water into their sewer systems. However UV cured fiberglass pipe lining is environmentally friendly for pipe rehabilitation.

According to a Jan/Feb 2005 article in Stormwater magazine, when a failed storm sewer pipe 18 miles east of Breckenridge, Colorado, was causing a sinkhole underneath I-70 the Colorado Department of Transportation (CDOT) decided to use cured in place felt liner to repair the pipe instead of replace it. They used a polyester felt tube liner, saturated with resin and coated with a waterproof layer which was inserted into the pipe. Hot water or steam was circulated through the tube, which hardened the resin. Because of the styrene-laced by-product of using felt with water or steam curing, the CDOT environmental division directed the liner company to construct a temporary holding pond with an EPDM (ethylene propylene diene monomer) geomembrane liner to capture any styrene-laced cure water. The liner company then had to pump out and haul the water off-site to avoid any environmental contamination. If they had used UV fiberglass cured in place pipe, they would not have had this problem causing additional time and expense to the job.

Another advantage to fiberglass cured in place pipe lining over felt is the curing time. The curing time for felt liners is 2.5 hours but only 50 minutes for a length of 300 feet of 8" UV CIPP liner. There is also one to two hours cooling time for felt and zero for fiberglass.

If you look at just the curing speed and the effect on the environment, you can already see how UV cured fiberglass liner makes more sense than using felt. But add to that the fact that the fiberglass pipe lining does not shrink (felt shrinks up to 13%, requiring residual grouting and lateral seals) and it has a minimum life span of 50 years, you really see how using fiberglass CIPP liner is the right choice.

If you are looking for a Florida Pipelining Services than please call 866.399.2284 or
complete our online request form.

© 2010 Renewaline Pipelining
Renewaline is a subsidiary of
Tampa Bay Plumbers

All Rights Reserved

 

Renewaline Pipelining
PO Box 2377
Middleburg FL 32050
Phone: 866.399.2284

Lic # CFC1425985

Contact Us

 

Sewer Services:

Company:

Privacy Policy | Terms of Use | Resources | Sitemap

 

Service Cites:

Tampa, FL | St Petersburg, FL | Clearwater, FL | Orlando, FL | Ft Lauderdale, FL | West palm beach, FL | Del Ray Beach, FL | Miami, FL | Sarasota, FL | Lakeland, FL | Bradenton, FL |


Service Areas:

Alachua County | Baker County | Bay County | Bradford County | Brevard County | Broward County | Calhoun County | Charlotte County | Citrus County | Clay County| Collier County | Columbia County | DeSoto County | Dixie County | Deval County | Escambia County | Flagler County | Franklin County | Gadsden County | Gilchrist County | Glades County | Gulf County | Hamilton County | Hardee County | Hendry County | Hernando County | Highlands County | Hillsborough County | Holmes County | Indian River County | Jackson County | Jefferson County | Lafayette County | Lake County | Lee County | Leon County | Levy County | Liberty County | Madison County | Manatee County | Marion County | Martin County | Miami-Dade County | Monroe County | Nassau County | Okaloosa County | Okeechobee County | Orange County | Osceola County | Palm Beach County | Pasco County | Pinellas County | Polk County | Putnam County | Santa Rosa County | Sarasota County | Seminole County | St. Johns County | St. Lucie County | Sumter County | Suwannee County | Taylor County | Union County | Volusia County | Wakulla County | Walton County | Washington County