Recent CIPP Projects
-
USF Medical Building, One Davis Island Blvd

Essex Towers, Fort Lauderdale, FL
We lined 28 roof vents for Essex towers in less than one week without anyone having to move out or be inconvenienced by loss of use of their homes.

Tampa Bay Plumbers solved the buildings problems without shutting down any of its operations, which take place 24-7-365. We lined two vertical stacks and performed high pressure drain cleaning.
-
University of Tampa, Tampa FL

We installed a 75 foot shot of 6.0 inch pipe that went under a mechanical building, without shutting them down in any capacity.



